某输电线路2A-ZM2直线猫头塔(呼高36m)组立施工技术设计

 2022-11-09 11:11

论文总字数:17923字

摘 要

某输电线路工程 2A-ZM2 直线猫头塔(36m呼高)组立施工技术设计要面对的主要问题,结合相应参考文献及资料,寻找出适合此直线猫头塔的组立方案,并对所选择出的方案进行比对,将方案的好坏处、是否安全可靠、适用情况进行详细的比对验证,最终选择出最适合此直线猫头塔的组立施工方案。

在此毕设的过程中,有三大部分需要我们进行详细计算,塔腿段的受力分析、塔身最重部分的受力分析、次重较高部分的受力分析,这三部分需要我们熟练的运用图解法和数解法去计算,然后根据相关参考文献进行验证,最后根据图解法得出来的最大受力值去选择我们所需要的工器具,其他相应的工器具要根据所需尺寸条件,并参照国家最新标准选择。

在完成论文主体的相应撰写以及计算后,我们需要运用AUTOCAD软件绘制出所需的杆塔布置图和受力分析图,并以数解法验证图解法是否正确,以此进一步精确计算结果。

本课题组塔方法选择内悬浮内拉线抱杆分解组塔。

关键词:直线猫头塔;内悬浮内拉线;抱杆组立;图解法;数解法

Construction Design of Tower Construction Technology for Transmission Line 2A-ZM2 Linear Tower (36m in Call height)

Abstract

A transmission line project 2A-ZM2 linear cat head tower (36m hoop high) group construction technology design to face the main problems, combined with the corresponding references and materials, to find suitable for this straight-line cat head tower group scheme, and the choice of the scheme to compare, the scheme of good or bad, whether safe and reliable, the application of a detailed comparison verification, and finally choose the most suitable for this straight cat head tower group construction program.

In this process, there are three major parts that need us to carry out detailed calculations, the force analysis of the tower leg segment, the force analysis of the heaviest part of the tower body, the force analysis of the secondary higher part, these three parts need us to skillfully use the plot method and the number of solutions to calculate, and then according to the relevant references to verify, and finally according to the maximum force value obtained by the plot method to select the tools we need, other corresponding tools to be based on the required size conditions, and the latest national standards.

After completing the corresponding writing and calculation of the main body of the paper, we need to use AUTOCAD software to draw the required pole tower layout and force analysis diagram, and verify the correct plot by numeric solution, so as to further accurately calculate the results.

The group tower method selects the inner suspension pull rod to decompose the tower.

Keywords: Cay-like Line Intermediate Towers;Inner suspension pull line; Holding Rod Group;Graphic method; Graphical method

目录

摘要 I

Abstract II

第一章 引言 1

1.1 毕业设计的目的 1

1.2 毕业设计的选题 1

1.3 毕业设计内容 2

1.3.1 组立杆塔方法介绍 2

1.3.2 送变电前景及发展 3

第二章 某输电线路 2A-ZM2 直线塔(36m呼高)组立施工技术设计 5

2.1 组立杆塔方法选择原因 5

2.2 组塔方式基本原则选取 5

2.3 AUTOCAD 的介绍 5

2.4 图解法与数解法的优缺点 5

2.5 各部分铁塔构件 6

2.6 输电线路 2A-ZM2 直线塔(标准呼高36m)的设计图 6

2.7 塔腿部分受力的图解法和数解法 6

2.7.1 塔腿吊装布置 6

2.7.2 塔腿部分吊装受力分析图计算数据汇总 6

2.7.3 塔腿部分吊装受力分析的图解法 8

2.7.4 塔腿部分数解法论证图解法 10

2.8.塔身最重部分受力分析的图解法和数解法 12

2.8.1 塔身最重部分吊装布置图 12

2.8.2 塔身最重部分吊装受力分析图解法 12

2.8.3 塔身最重部分数解法验证图解法 16

2.9 次重较高部分受力的图解法和数解法 18

2.9.1 次重较高部分吊装布置图 18

2.9.2 塔身次重较高部分吊装受力分析图解法 18

2.9.3 次重较高段数解法验证图解法 22

2.10 受力大小分析 24

2.11 主要工器具的选择 25

2.11.1 钢丝绳的选择 25

剩余内容已隐藏,请支付后下载全文,论文总字数:17923字

您需要先支付 80元 才能查看全部内容!立即支付

该课题毕业论文、开题报告、外文翻译、程序设计、图纸设计等资料可联系客服协助查找;