2╳16.5m钢筋混凝土连续箱梁设计

 2022-12-26 08:12

论文总字数:34940字

摘 要

钢筋混凝土结构的箱梁一般分为预制箱梁和现浇箱梁。在独立场地预制的箱梁配合架桥机可在下部基础工程完成后进行架设,可加快工程进度、节约工期;现浇箱梁多用于大型连续梁桥。这次设计主要是钢筋砼连续箱梁。钢筋砼连续箱梁是在工厂中加工好后再运至现场安装,有全钢结构,也有部分需要添加钢筋混凝土铺装层。

关键词:钢筋;混凝土;现浇;连续;箱梁;

Design of 2 × 16.5m Reinforced concrete continuous box girder

Abstract

The box girder of reinforced concrete structure is divided into prefabricated box girder and cast-in-situ box girder. The box girder prefabricated on an independent site can be erected after the completion of the lower part of the project, which can accelerate the project schedule and save the construction period; cast-in-place box girder is mostly used for large continuous bridges. This design is mainly reinforced concrete continuous box girder. Reinforced concrete continuous box girder is generally processed in the factory and then shipped to the site for installation. It has an all-steel structure, and some require the addition of reinforced concrete pavement.

Keyword:Rebar;Concrete; cast-in-place; continuous; box girder;

目录

摘 要 II

Abstract III

第一章 项目概述 1

1.1 项目基本信息 1

1.2 主要材料 1

第二章 模型概述 3

2.1 模型信息 3

2.2 计算规定 3

2.3 施工阶段 3

第三章 梁1计算结果 5

3.1 持久状况承载能力极限状态 5

3.1.1 正截面承载力 5

3.1.2 斜截面承载力 9

3.1.3 标准值组合支座反力 14

3.2 持久状况正常使用极限状态 14

3.2.1 裂缝宽度验算 14

3.2.2 挠度验算 16

3.3 短暂状况构件应力计算 18

3.3.1 受压区混凝土边缘的压应力验算 18

3.3.2 中心轴处的主拉应力(剪应力)验算 24

致谢 31

参考文献 32

第一章 项目概述

项目基本信息

表1.1基本信息表

名称

内容

计算规范

2018公路规范

结构重要性系数

1.1

环境相对湿度

0.8

环境腐蚀级别

Ⅰ类

模型类别

空间杆系

表1.2计算内容表

计算项

设定

计算预应力

进行验算

是否调索

是否调束

计算收缩

计入安装初位移

是否考虑弯负弯矩折减

截面钢筋应力计算点限制

2

阶段徐变天数细分原则

等差划分

是否考虑几何非线性

活载是否考虑非线性

刚性单元刚度调整系数

1

计算徐变

计算活载

计算水平力

计算屈曲

计算振动

计算倾覆

计算抗震

1.2主要材料

表1.3主要材料索引表

编号

名称

材料类型

材料索引

1

HRB400

钢筋

HRB400

表1.4混凝土材料参数表

索引名

E

(MPa)

线膨胀

剩余内容已隐藏,请支付后下载全文,论文总字数:34940字

您需要先支付 80元 才能查看全部内容!立即支付

该课题毕业论文、开题报告、外文翻译、程序设计、图纸设计等资料可联系客服协助查找;